A clear request for quotation saves time on both sides. When a supplier has the right information from the start, there are fewer back-and-forth questions, and the quotation is more likely to reflect the part you actually need. Use this checklist before you send your next carbide RFQ.
The RFQ checklist
| Item | What to include | Why it matters |
|---|---|---|
| Drawing | A PDF drawing, or the main dimensions if no drawing exists | Defines the geometry and shows how complex the part is |
| Tolerances | Dimensional, geometric and critical-feature tolerances | Tight tolerances can change the grinding and inspection work |
| Surface finish | Required finish on each functional surface | Polishing or fine grinding can affect process and cost |
| Grade or conditions | A preferred grade, or the working conditions if you are unsure | Lets engineers confirm or suggest a suitable grade |
| Quantity | Order quantity, plus annual volume if repeat orders are likely | Affects tooling decisions and pricing |
| Delivery | Target date and destination | Shows early on whether the schedule is realistic |
| Documents | Inspection reports or certificates you need | Allows requirements to be agreed before production |
If you do not have a drawing
You can still ask for a quotation. Send the main dimensions, a clear photo with a scale or measurements, and the function of the part. If you have a used sample, mention it, and describe how it wore or failed. A drawing will usually need to be agreed before production so that both sides work to the same specification.
If you do not know which grade to use
Do not guess. It is more useful to describe the conditions than to name a grade that may not fit:
- What the part does, and what material it contacts.
- Whether the load is steady, abrasive or impact-heavy.
- Working temperature, and any coolant or corrosive fluid.
- How the current part performs, and why you want to change it.
Common details that get missed
- Units and standards: state clearly whether dimensions are metric or imperial, and which tolerance standard applies.
- Revision level: confirm that the attached drawing is the current version.
- Critical features: mark the dimensions that really matter, so that unnecessary tolerances can be discussed.
- Rod details: for carbide rods, include diameter, length, chamfer and end form, and any coolant hole layout.
- Packing or marking: mention any special requirements early.
Send your RFQ
On our Request a Quote page, you can enter your requirements and attach a drawing of up to 30 MB in PDF, DWG, DXF, STEP, IGES, JPG or PNG format. Our engineers will review it and reply with questions or a quotation. If your drawing is confidential, tell us before sharing it.

